Assembly
Besides the planning and the industrial prefabrication an efficient assembly is a substantial requirement for a successful project. Structural components with a length up to 50 m and an own weight up to 75 tons need a detailed assembly preparation with follow up plans, an authorized traffic permission and special lifting machinery. Experienced construction managers and foreman provide a fast assembly on which our clients are always amazed.